The plans for the 3 houses (Dec. 17, 2019)
The plans are as they stand today (Dec. 17, 2019). As mentioned, we do not have a permis de construction yet. This permis will be sought once we have 3 families (or 3 investors) that want to build these houses on our land,
We plan to sell the land and plans to the future owners. Future owners will be contract builders etc. to have the 3 houses built. We can probably help manage the building site during construction.
Some comments in relation to the plans:
1. Houses should be almost energy independent. Heating will be electric – solar cells cover the roofs. Walls and roofs will be 50cm thick mostly insulation.
2. One wall on the ground floor will be entirely window – the windowpanes will be triplex glass.
3. Today an underground garage is not planned due to the expense involved. Should the future owners want an underground garage that can be added to the plans … if the decision is made before building starts. An underground garage has the advantage of moving outside parking underground.
4. The shape of the roof is in order to let the maximum amount of light into the building on the sides where windows are not allowed due to building regulations
![]() |
| Ground Floor showing the large windows along one side ... |
![]() |
| 1st Floor - NB the thick very well insulated walls |
![]() |
| The cross-sections as noted on the 2 floors |